User manual CISSELL SFBMAN99

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual CISSELL SFBMAN99. We hope that this CISSELL SFBMAN99 user guide will be useful to you.


CISSELL SFBMAN99 : Download the complete user guide (1006 Ko)

Manual abstract: user guide CISSELL SFBMAN99

Detailed instructions for use are in the User's Guide.

[. . . ] Steam Finishing Board Model A OWNERS MANUAL CISSELL MANUFACTURING COMPANY HEADQUARTERS 831 SOUTH FIRST ST. BOX 32270 LOUISVILLE, KY 40232-2270 PHONE: (502) 587-1292 SALES FAX: (502) 585-3625 SERVICE/PARTS FAX: (502) 681-1275 THIS MANUAL MUST BE GIVEN TO THE EQUIPMENT OWNER. MAN99 39 /8 Page 1 WARRANTY The Cissell Manufacturing Company (Cissell) warrants all new equipment (and the original parts thereof) to be free from defects in material or workmanship for a period of one (1) year from the date of sale thereof to an original purchaser for use, except as hereinafter provided. With respect to non-durable parts normally requiring replacement in less than one (1) year due to normal wear and tear, including, but not limited to, cloth goods, valve discs, hoses, and iron cords, and with respect to all new repair or replacement parts for Cissell equipment for which the one (1) year warranty period has expired, or for all new repair or replacement parts for equipment other than Cissell equipment, the warranty period is limited to ninety (90) days from date of sale. [. . . ] Make certain that steam supply, steam return, and electrical connections have been made per installation instructions. If iron lowboy has a separate steam supply and return valves, open them also. Turn on the electrical switch for the iron and lowboy, so the iron can be heating also. After preheating, if the board is hooked into a central vacuum system, make certain that it is operating. If the board is provided with steam vacuum, make certain that it is operating. Depress the iron thumb switch and observe the steam flow through the iron lowboy. Vacuum or upstream may be applied to the entire buck surface immediately by depressing the appropriate foot pedal. (Although both foot pedals can be depressed together, the vacuum is inoperative when upsteaming is being performed). Iron garment using vacuum and/or up stream as required, until desired garment finish is achieved. Solenoid Coil (120/50-60) Solenoid Coil (240/50-60) Shield Bottom Cover Plunger Casing Assy. Small Pack Ring Gasket Cable Assy. 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 L B 7 . . . . . . . . . . . . . . . Steam Hose Hose Clamp Hose Clamp Spring Clip S Hook 90° Connector Cable Bushing Flexible Cable Spring Support Plate 1/4 - 20 x 1/2 Set Screw 5/16 x 2 Hex Hd. Screw Rating Nameplate 1/2 x 3 Pipe Nipple 1/2 Pipe Tee Switch Cover Plate Double Pole Switch Amber Light 110V Amber Light 220V Box Welded Asm. Terminal Mounting Plate Terminal Block 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 LB59 . . . . . . . . . . . . . Label Strain Relief Bushing Cup Washer Green Ground Screw 1/2 Close Nipple Condenser Assy. 50/60 Cy. ) Not Illustrated Page 11 INSTALLATION SET UP: Set unit in position and fasten securely to board. IMPORTANT: Before making steam return connections to unit, make steam supply connections. Remove all drain plugs, open steam supply globe valve to steam-flush any borings, grindings or foreign matter that may be clinging within casting or pipes. Close globe valve; replace drain plugs and make steam return connections. Before attaching steam hose from steam-electric iron to solenoid valve, with steam pressure on unit operate thumb switch several times to remove loose particles of scale or dirt, whick may become embedded in valve seat. STEAM SUPPLY: Steam supply connection must fall towards machine (without water packets). Make connection with 12 or more riser out of steam supply line with union and globe valve. [. . . ] BRING CORD FROM 2 UP AND AROUND COLUMN MOUNTING AND THROUGH SLOT 3 ON RIGHT SIDE. PULL TWO CORD TIGHT AT FRONT OF CLOTH AND CRISS-CROSS THROUGH SLOT AND AROUND DRAW ROD ON EACH SIDE AS SHOWN. DRAW CORD TO CENTER BENEATH BOARD TIGHTEN AND TIE SECURELY. Page 23 CISSELL HEAD VALVES OP547 . . . . . . . . . . . . . . . . . . Core Plug SKL74 - Valve Service Kit* Plastic box containing these parts & qty. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE CISSELL SFBMAN99




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual CISSELL SFBMAN99 will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.